THE PROJECT

About five years ago we fell in love with a place and an idea ..

The initial situation was so compromised that it certainly did not entice and it took great courage to undertake a recovery .. deterrent for which the mill had remained in total oblivion for over 60 years. If the initial abandonment could be justified by the fact that these structures were now industrially and economically considered out of the historical course and at the sunset of an active functional location, to date ... the only concrete and prospective alternative is to loudly recall their value intrinsic by relocating them functionally. Molino Maufet in its path which unfortunately started from scratch, has been structured to be an incubator of experiences aimed at being an example of a dynamic role that can be exported to other realities. It is therefore a question of protecting memories, traditions and values, but also of looking at new paths, including that of the micro-hydroelectric.

We thought that restoring this Molino and giving it a new functional location was the best way to protect it and preserve it over time .. and this is how now, when the work is almost completed, as a first step, its doors open to visits by appointment and it is It is also possible to spend a few days in one of the cozy accommodations of the Guesthouse:

La Volta, Il Granaio, Casa Amalia, Il Fienile, La Roggia, Alle Macine

- Dec 2017 - II

Illuminazione esterna.

- Dec 2017 - I

Restauro secondo buratto e prima macinazione con il piccolo mulino.

- Nov 2017 - III

La deviazione d'acqua in roggia

- Nov 2017 - II

Il Mulino Austriaco

- Nov 2017 - I

Il ripristino dell'affresco di Santa Cristina

- Oct 2017 - VI

Tutto si illumina e prende forma

- Oct 2017 - V

Verso la nuova ruota: i raggi

- Oct 2017 - IV

Primo passo verso la nuova ruota: il mozzo

- Oct 2017 - III

Dopo la forgiatura - tornitura ed alcuni mesi di giustificata attesa, ci vengono consegnate le due coppie di perni per gli alberi (fusi)

- Oct 2017 - II

Allestimento del primo Ballatoio lato Ovest

- Oct 2017 -

Studi ed ipotesi c.a la Ruota 

- Sept 2017 -

Esterno:  rifacimento della Roggia in sasso (di superficie e sotterranea), riassetto dei livelli della vasca (sede delle Ruote) + opere idriche principali (tubi e pozzetti), rifacimento dei piani di calpestio.  

- Aug 2017 -

Realizzazione della struttura della roggia (metallica e lignea). Posizionamento delle regge sugli alberi (fusi).

- July 2017 -

Inizio restauro delle due ruote interne (lubecchi).

- Jun 2017 -

Realizzazione vasche per accogliere le due ruote esterne, recupero e parziale installazione degli alberi (fusi), consolidamento dei muri, fabbricazione di alcune strutture idrauliche.

- May 2017 -

Restauro del paranco e sostituzione di parte del piano macina.

- Apr 2017 -

Sostituzione delle strutture compromesse a sostegno delle macine, rifacimento di alcuni meccanismi, allestimento della pavimentazione dei pozzetti sotto-macina.

- Feb 2017 -

Rimozione delle sovrastrutture e di parte del tetto. Primi scavi. 

- Gen 2017 -

Valutazione della struttura e rimozione della vecchia ruota esterna. Recupero antichi buratti e madie.

- Dec 2016 -

Inizio dei lavori: osservazione e prima grossolana pulizia.

- Oct 2016 -

Il primo impatto con la vecchia struttura.